Hardwood Installation

Trust Derailed Commodity Flooring & Furniture for your installation needs!

Woman moving sofa | Derailed Commodity Flooring & Furniture

Before Installation

Before your hardwood installation, you should expect/complete the following:

  • A walkthrough with our team.
  • Ensure that children and pets are not present during installation day. This is for their safety and ours.
  • You should complete any painting that might need to be done before we begin the installation.
  • Ensure that someone 18 or older will be present on the day of the installation.
  • Remove any furniture or fragile items from the room or rooms in question.

during installation

During your hardwood installation, you should expect:

  • Preparation will be completed.
  • For a glue-down hardwood installation, adhesives will be spread on your subflooring, and hardwood planks will be laid individually. Our crew will cut the hardwood pieces to fit the room's layout while ensuring no gaps exist.
  • For a nail-down hardwood installation, a similar process will be followed as the glue-down installation, but our crew will use nails instead of adhesive.
  • We will clean up and assess our work.

after installation

After your hardwood installation, you should expect:

  • A walkthrough with our team.
  • The recommendation to run a fan or open windows to address installation-related smells.
  • The recommendation to stay off your hardwood flooring for 24 hours to allow the materials to settle.
Estimate | Derailed Commodity Flooring & Furniture

OFFERING FREE ESTIMATES

Kitchen hardwood flooring | Derailed Commodity Flooring & Furniture

BROWSE PRODUCTS

Little boy drawing a picture on the floor | Derailed Commodity Flooring & Furniture

hardwood CARE & MAINTENANCE

BE INSPIRED.

hardwood GALLERY